We are working in Davis, California, placing approximately 8 miles of pipeline.

The City is constructing an eight-mile water pipeline,12”-30” diameter, connecting the City’s water system to the Woodland-Davis Clean Water Agency’s system. The joint pipeline system will transport water from the Sacramento River to the Regional Water Treatment Plant in Woodland, and deliver the new surface water to residents and businesses in Davis.

In addition the project includes flow & meter vault structures, with electrical and telemetry systems and four Bore & Jack crossings under railroad and Highway 80 and a Directional drill under 1,200 lf long directional drill under highway 113 at 90ft deep.

Construction began in July 2015 and will be completed by Winter 2016.